20 questions from our users

Trish Martin

Trish Martinasked

RedInk Homes

Hello, very interesting reading!!
I have just bought a Redink home, built 10 years ago. I am the third owner.
I have just realised this home does not have any soak wells installed, AT ALL.
It is my understanding that these are mandatory, even 10 years ago.
Explanation, please!!
Trish Martin



1 answer
RedInk Homes
Customer Service S.RedInk Homes

Hi Trish,

Thanks for your question. The install of the stormwater soakwells can be by builder or by owner. We supply and install them if our client has included them in their building contract, otherwise they are supplied and installed by owner.

The best way to determine exactly what has or should have been done at your property is to contact us directly. We understand that it can be confusing as a second and third owner as to what has been done by us and what has been done by the homeowner. We are always happy to help with this sort of query, so if you can please contact our office on 08 9208 1111 or by email [email protected] with your street address then we can assist further.

Kind regards,



The Redink Team

Ken B.

Ken B.asked

RedInk Homes

The Tek Screws on my Colourbond roof are rusting as are the nails in the eaves. Are these covered under the structural warranty.
Thanks
Ken

1 answer
RedInk Homes
Customer Service S.RedInk Homes

Hi Ken,

Can you please contact our Maintenance department in our office (08 9208 1111)? Otherwise please email photos, along with confirmation of your address to [email protected] to allow us to assist you further.



Many thanks

Kind Regards,

Customer Service Team

John

Johnasked

RedInk Homes

Any Red Ink owners built the Drover Farm House design in the metro area? We are looking at this design and wouldn't mind having a look at one in the flesh.

Thanks
John

1 answer
RedInk Homes
Customer Service S.RedInk Homes

Hi John,

Thank you for your enquiry - please contact the Sales Team on 9208 1110 and they'll be more than happy to assist.

We look forward to hearing from you

Regards,
The Redink Team

Elal B

Elal Basked

RedInk Homes

Has anyone built the Entertainer plan? Wondering if you had any feedback / thoughts on the design?

1 answer
RedInk Homes
Customer Service S.RedInk Homes

Hi There

Thank you for your enquiry - please contact the Sales Team on 9208 1110 and they'll be more than happy to assist.

We look forward to hearing from you

Regards,
The Redink Team

First time building

First time buildingasked

RedInk Homes

Has anyone had this situation where by after pre start selection has completed, they seem to reply to queries at a much slower rate? Can anyone tell me how Long does it take from prestart completion to slab down? I was told 3 weee for drafting team to complete final draft then send off to shire. Does that mean it is going to take another 2-3 months?

3 answers
RedInk Homes
Customer Service S.RedInk Homes

Thank you for taking the time to get in touch, we'd love the opportunity to further review your queries and concerns.
Please contact [email protected] with your details so we can assist.
We look forward to working with you on your first build

Regards,
The Redink Team

I'm just very disappointed that it always feel as though before signing the documents, your people seem to be very enthusiastic etc no once the papers are signed, the communications become slower and less genuine. Shouldn't all customers be treated the same at all stages of the build? I just want this building to be completed asap, so I can stop worrying and trying to get in contact with u people.

U could perhaps send a generic email to all your staf reminding them to promptly respond to customer's queries. I shall not at this stage contact you for further review. But will do so when things become worse.

Disappointed
Disappointed

2018 and it hasn’t changed, very poor customer service. Sales guy was great though, but went down hill after that.

Jake

Jakeasked

RedInk Homes

RedInk you have built a home next to my block in Ravenswood and your contractors, bricklayers, concreters etc have been using my block as an access to deliver materials, my kerbing is now damaged and cracked in multiple spots and as it states in the developers annexure the owner is liable for and damaged caused by the builder, seeing as you are not my builder, I assume RedInk would be liable no?

1 answer
RedInk Homes
Customer Service S.RedInk Homes

Hi Jake,

Thank you for getting in touch; if you can please contact [email protected] with your contact details we'll be in touch to discuss and review.
In the meantime we've been in touch with the Site Supervisor who will carry out a site inspection to determine any damage which has occurred and confirm course of action to follow.
We do sincerely apologise for any inconvenience caused and will ensure your concerns are addressed.

Regards,
The Redink Team

Luke

Lukeasked

RedInk Homes

Hello, I built with Redink homes in ( geraldton) about 4-5 years ago, I have tryed everthing to fix my ceilings and bulk heads, that keep cracking and my ceiling showing join lines in plaster board, not to mention the paved drive way that is uneven and sloping on 1 side . And seen to be higher then the footings of the house . So moisture is seeping thought the brick work in my garage, I would like to know where I stand before getting a independent building report . Thank you luke

3 answers
Building Manager
Building Manager

Hello Luke, Can you please contact the Midwest office on 99208900 and advise us of your home address, so that we can investigate these issues for you? Look forward to hearing from you soon. Kind regards Building Manager

Sam
Sam

Hi Luke,
Cannot help you much than to advise you to contact the building company and see what they can do.
Sam

Luke
Luke

Thank you for your reply, will be working out of town tomorrow and won't have the best signal but will contact you shortly. Appreciate your prompt response

NikReed

NikReedasked

RedInk Homes

Warranty for my REDINK home - My home is now 2 years old and have my door handles breaking. The product quality is of POOR standards !!! I see homes last 20+ years with these items lasting as long. I want these fixed - My home was costly to build, and REINK assured me their products and standards were one of the highest ... I dis-agree !!!!! Who do I need to speak to for this to bed fixed at NO COST ?!!?!

2 answers
RedInk Homes
Customer Service S.RedInk Homes

Hi NikReed,

Thank you for getting in touch, we're sorry to hear of your frustrations with the product we have supplied.
If you can please contact the Maintenance Department on [email protected] with your details, they will be more than happy to assist in following through with the manufacturers to see this resolved as promptly as possible.
Regards,

The Redink Team

NikReed
NikReed

I have now been in touch and has been rectified... Thankyou for the answering online...

Scheepers

Scheepersasked

RedInk Homes

How do you get incontact with somebody at the top, somebody that doesn't have to report to someone else? Somebody at REDINK that actually gives a care!!

1 answer
boydee
boydee

Chris Thomas is your Man, helped us out when no else would after house caught fire 1 week before settlement,

EddieD

EddieDasked

RedInk Homes

I am assisting a close relative who has problems with his Redink contract and would like to contact A Khan's lawyer who appears to have had the relevant experience to pursue this matter?

3 answers
margaret hudston
margaret hudston

Hi Eddie, could you please tell me what a Khan's lawyer is. I am currently representing myself but am looking for a good lawyer? Margaret 0419033856

EddieD
EddieD

Sorry Margaret - I have not yet had an answer from A Khan and maybe will not get one - but be assured I will let you know if I can get some resolution

just customer
just customer

Hi Eddie, I would like to help in this case. I do have same experience currently with them. Please let me know if there is anything I could help (Will - [email protected]).
Thanks

Chris

Chrisasked

RedInk Homes

I have just finished building with Redink and they failed to Seal my walls causing the pain to peel off. Anyone else has this problem?

1 answer
James
James

You are meant to sealed the walls yourself using oil based sealer.

Cameron

Cameronasked

RedInk Homes

At what stage do you get a completion date? I've been told by many friends that they got a completion date at lock stage.

4 answers
Peter and Tina
Peter and Tina

Mate, we never got a completion date, It was just a vague sometime in the future comment by the supervisor
Lockup was very quick & then it seems like nothing gets done after that.
Use this site to complain as the Managers get right onto it, if its out in the social media, At least thats what we found.

Good luck

First build
First build

Your addenda contract provides a "so many days from date of commencement" which apparently is slab down when querying it I was told 6 months from slab down so I am expecting Sept. Will let you know...

Cameron
Cameron

Yes we were told 6 months from slab down. It will end up around 9 months+. We were also told they would have a date once we got to lock up stage. We got nothing but excuses and them avoiding the question. Then we were told once the tiles have been laid we would get a date. You guessed it.. nothing but more excuses.

mohini

mohiniasked

RedInk Homes

can you put pools in every house you make and do you put pools in every house you make?

1 answer
RedInk Homes
Customer Service S.RedInk Homes

Good afternoon Mohini

As a project builder, we do not install pools in our Redink homes but we are always happy to work with our clients’ chosen pool company. It is necessary to advise your building company at the planning stage that you are considering installing a pool so that any additional structural requirements can been taken into consideration.

Kind regards
The Redink Team

Egoist lass

Egoist lassasked

RedInk Homes

Does anyone know who to send complaint at Redink Homes Management? We are building a house with Redink and we should have read over the reviews before we sign up on them. I am not sure if the people such as the Site Supervisor ever know about PERT CPM or even a simple time management and coordination? I have tried to email Amanda Matthews previously and her answer is I find out with the Supervisor. I have meet with the Construction Supervisor and still only words no concrete actions. They seem to be so laxed and poorly managed and doesn't seem to know the word "Timeliness" and "Keeping their words". The Supervisor is not there when a job is started which is the reason why there are so many errors and backjobs. I have so many to reiterate and it seems that we are the one supervising the build as we are the ones reporting to Redink that this is not right and this one is missing or this material is lacking! Do their top management ever know what's going on with their people or operation?

2 answers
Peter and Tina
Peter and Tina

Yes, use this site, Their management dont like people warning others about how bad they are.
We did twice, and low & behold a phone call next day, Not much else but at least we got that !!

First build
First build

We have practically been supervising our build as well. Its disgusting service you are literally waiting in line for something to happen wile a trade starts your job and goes to other sites to juggle three houses at once instead of finishing one before moving on to the next. Ask the office for your site supervisors manager to give you a call it helps if you have specific examples. Start keeping a diary!

Unhappy

Unhappyasked

RedInk Homes

I'm building with Redink at the moment and boy are they dragging there feet. There blaming weather and now Christmas for the delay, But i look at my block and houses are going up left, right, and center all around my block by every other builder. Is anyone else have time issues like this?

2 answers
RedInk Homes
Customer Service S.RedInk Homes

Good afternoon “Unhappy”

I would like the opportunity to resolve your problem but will need further information. Would you like to email me your details to [email protected] so that I can follow up on your behalf and find a resolution. Look forward to hearing from you.
Kind regards
Amanda

suzieq
suzieq

I have the same issue with 101 residential who are owned by the same people. My house was started in june (contract signed inJanuary) and is not even at lock up. The house next to mine whose contraction started at exactly the same time as mine is now a week away from hand over. The delays are caused by them taking so long to rectify issues raised (mostly because they first try to deny anything is wrong and do everything they can to avoid doing any work at all. 3 months after my brickwork was finished they still have not fixed all the issues I have raised and anything they have done has only caused other issues. The two houses next to mine are red inks and their slabs went down before mine, their brickwork only started a month after my brickwork was finished. They are now at lock up but they have essentially had the one team working on both houses, so they do one stage with one house and then the same trades go and do that stage on the other house. Good Luck!!

Dmf

Dmfasked

RedInk Homes

I have just had my builder. (redink) phone to say that there will be a $20.000.00increase in their earthworks and siteworks costs from $12.000.00 to $32.000.00 . Because there is cap stone under the earth . We have not even got to prestart yet, is this the norm?

5 answers
Bilby
Bilby

Wow- that's sounds excessive. Do you have a fixed contract for your siteworks? To be honest I don't know too much about earthworks, we were just on a pretty standard suburban block on an estate so our whole site works was $7800 (fixed) I'd be asking them to justify and itemise the cost and read through all your contractual fine print - sorry I can't be any more help. Good luck.

RedInk Homes
Customer Service S.RedInk Homes

Good morning DMF
At the sales stage reps are only able to estimate the cost of earthworks and siteworks based on prior experience from building in an area.
The exact condition of each individual lot are not known until we request a site survey and engineers report.
Unfortunately without knowing the details of your job it is difficult to comment specifically, but obviously a large amount of rock has been discovered which will regrettably affect your building costs.
If you would like to discuss this further please don’t hesitate to contact me at the office.
Kind regards
Amanda Matthews

d&n
d&n

Whilst that sounds high for works you can always get an independent estimate. I have found Redink to be very approachable and fair. The last thing they want is to sour the relationship before you have commenced building. This is a bitter pill to swallow and in their defense the only time they would be certain of the costs is when they commence works ? The estimate they gave us was within $ of the actual cost.

lost in secret harbour

lost in secret harbourasked

RedInk Homes

I built with redink worst decision i ever made now to top it of damage to my walls is apparently acceptable do your painters fix any damage caused or do they paint straight over it???

1 answer
RedInk Homes
Customer Service S.RedInk Homes

Hi lost in secret harbour,
All work carried out by Redink and our Contractors is done to the appropriate standard. This is how we are able to offer the lifetime structural warranty. Having said that, if you are not satisfied with the work which has been carried out please e-mail your details to [email protected] and I will look into this on your behalf. After all, you are the one living in the house so your satisfaction is paramount.
Regards,
Ryan Hewitt

angel163

angel163asked

RedInk Homes

Hi we are building our home with Redink and nearly at pre start stage. Do we get to chose our rep or do we ge given one? After reading some of the review's here l am hope and praying it goes smoothly

4 answers
Michellew
Michellew

Do you mean Rep or Building Supervisor? Your rep is usually the person you signed on with. The building supervisor is allocated depending on where you are building, or at least that has been our experience. Hope that helped good luck with your pre start.

angel163
angel163

Hi Michellew,

Yes thank you for replying.
How has your expirience been so far with Redink.

Michellew
Michellew

hi angel163

Pretty good experience overall. Bit frustrated at the minute waiting for the final bits and pieces to be done. Seems the tradies are a bit reluctant to come back for minor things to finish off. Could be because we are a little out of Bunbury but hopefully this time next week we will have the keys.

bird.alcatraz

bird.alcatrazasked

RedInk Homes

I would like to know who supervised Daniells house from redink as I would like the same person on my build in honeywood

1 answer
RedInk Homes
Customer Service S.RedInk Homes

Hi bird.alcatraz,

Unfortunately we’re not sure who Danielle is, so we can’t determine who their supervisor is. At the time of that review, they hadn’t commenced construction, so their supervisor wasn’t a factor, but their friend’s (we don’t know who they are either) supervisor has delivered the Redink experience. Redink builds homes from North of Geraldton, out to the Eastern Wheatbelt, all the way down to South of Margaret River, and our Supervisors are assigned dedicated zones within that area to limit the travel required, and make sure they have the time to regularly visit their building sites.

Having said that, I’m confident that all of our Supervisors will deliver you a similar experience to Danielle’s friends. I can understand why you would want to make sure you got the ‘good’ supervisor, because not all supervisors are good. However, Redink has a great reputation and the best people want to work for us, so the bar we set is not industry standard. If we had a supervisor that wasn’t delivering the Redink experience, we’d replace them with the best of the people who are consistently trying to gain a position here.

Between your Supervisor (who you will be able to contact directly), your Client Liaison, and the rest of the Customer Service Team, you can be confident that you will enjoy the Redink experience.

Regards,
Ryan Hewitt

cc33

cc33asked

RedInk Homes

Hi
I am building with redink and quality of the house is very low. I have so many ongoing issues with them. Whenever I pointed out any defect / error / mistake, they have delayed work, at one time by 2 months. Construction started in Oct 2011 and reached lock up on 09/05/12 but now again no work since then. My question is who can I report about the quality of the house and about delaying the build.
thanks

8 answers
RedInk Homes
Customer Service S.RedInk Homes

HI cc33,
Unfortunately throughout the build process delays can occur. However, it is in our best interest to ensure the construction process is smooth and to remove any unnecessary delays. As such, this is something we aim to provide during all of our builds. If you would like to discuss this with our Construction Manager please e-mail your contact details to [email protected] and he will contact you at the earliest convenience. Alternatively our Customer Service Director is also available to meet with you and discuss the delays.

Kind Regards,
Ryan Hewitt

RedInk Homes
Customer Service S.RedInk Homes

Please note e-mail address is actully: [email protected]

cc33
cc33

Hi Ryan

Unfortunately there was some element of deliberate delays as evident from the letter we got from Redink and most of the delay was due to negligence. I have already discussed with office. Roof frame not done as per the drawing we signed. Found many other things that have not been done as per contract we signed. It is so frustrated to keep pointing out mistakes and that also obviously delays the process.
Kind Regards
cc33