Anonymous

Anonymousasked

We've changed our mind on some selections and noticed a few that weren't correct on our final selections contract (we haven't signed off on yet). We emailed our design consultant but the only response we received was one that emitted annoyance towards us with no questions or anything in our previous emailed referred too in a helpful manner. I understand from a designers point of view it can be frustrating if people change their mind but surely if we are paying hundreds of thousands of dollars for a home we have a right to make sure we are 100% content with our choices regardless of that meaning some things will be changed?



1 answer
Azd8
Azd8

Hi Anonymos,

I believe you can change your mind but it might cost you a change fee. If no answer comes you can ask for a manager phone/ email. A phone call can solve some doubts.
Good luck.

Riaz H.

Riaz H.asked

Hi is the quote for paving or concrete for the driveway usually mentioned in the original quote before you sign your contract or after you pay the deposit money

2 answers
Bagger
Bagger

Hi Raiz, we didnt ask nor was it mentioned in the quote.
I suggest you ask for a price before you sign the contact.



Azd8
Azd8

Hi Riaz,

Unless you ask for driveway to be added into the contract, it won't be added. You better go to a good sales consultant and there shouldn't be any issues. Otherwise, can be difficult to predict.
A good consultant won't please you with the price initially. However, when you receive you footings report you will be pleased.
Whereas, a bad sales consultant will attract you with the best price that will be all underrated and when you see a real price you will be very angry and upset.
So, good luck.

Melinda P.

Melinda P.asked

How much does it cost to upgrade the internals for built in wardrobes to 4 drawers, 3 fixed shelves and double rails for a 1910 wide and a 1500 wide robe?

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi Melinda,



Thank you for contacting Statesman Homes.

If you contact us directly at [email protected] we can pass your query along to the relevant department. Please provide your job number within the email so we can review your plans.

Kind regards,
The Statesman Homes Team

SAM

SAMasked

Hi. I was given a footing cost off around $34000 but after soil test & engineering report, its gone up to $40000.
Can't believe as i was in a tight budget but seems now i have to change my mind to build with you anymore.
Wondering if i do my own soil test & get the report for my satisfaction? Will you accept that report?
Thanks

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi Sam,

Upon signing, the amount allocated for footings is done as a best estimate based on historical jobs in the area.

Please contact your Client Services Liaison as they can investigate your site better and get an understanding of the increase.

Kind regards,
Statesman Homes

Julia

Juliaasked

Is there a system to unlocking doors after handover our keys do not unlock our doors?

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi Julie,

If you could please contact the office, we can have this sorted out for you!

Alternatively, please let us know your job number and a team member will be in touch.

Kind regards,
The Statesman Homes Team

Rj Callaghan

Rj Callaghanasked

Good morning
Just wondering what brand of laminate bench tops you use?
Kind regards
Ryan Callaghan

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi Ryan,

Thanks for getting in touch!

During the selections process you can choose from Laminex, Formica, Motivi and Egger.

Kind regards,
The Statesman Homes Team

SAM

SAMasked

What is the best/popular home design you have in & around 170m2? May i know rough idea about building cost please?
Thanks

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi SAM,

If you can please contact us at [email protected] with your contact details, a Building Consultant would love to have a chat with you about your new home needs and requirements.

Thank you,
The Statesman Homes Team

Amanda

Amandaasked

Hi,
Just wondering what the general time frame is for the 2nd fix phase.?
Our 2nd fix period started 23rd March & we were told a rough hand over date early May that was moved back to end of May which is only 4 weeks away. I'm mainly wondering as we still have no eaves up (which have been sitting on the ground in weather for 4 weeks now). Also waiting for bathroom/kitchen bench tops, plumbing, electrical fitting throughout, tiling in all wet areas, painting inside & out, air con, solar panels & solar heating....
Thank you in advance
Amanda

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi Amanda,

Thank you for your questions!

To assist us in answering your questions, could you please provide us with your job number so we can investigate and get in touch?

Kind regards,
The Statesman Homes Team

Rebecca

Rebeccaasked

Hello, our Statesman home is About 10 years old. Ensuite is leaking and has ruined the carpet in our bedroom and walk in robe. The door frames have swollen and paintwork bubbling. We have stopped using the ensuite until we can determine how best to go about fixing this problem. Our family is now using the main bathroom which we rarely used before this occurred. Have now noticed the main bathroom leaking also. Great concern that there is water proofing issue and what other problems this is creating that we can't see. Two bathrooms in the same house leaking. Help!!

Thank you Rebecca

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi Rebecca,

Thank you for getting in touch!

Best to contact our Client Services Team and they can investigate. Please call on 8366 0080

Kind regards,
The Statesman Homes Team

AlizahG

AlizahGasked

Hi
First home buyer here, just inquiring how long the process of build the homes are?
kind regards

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi AlizahG,

Thank you for reaching out!

The build time is really dependent on your final choices, however, if you choose one of our standard designs within the Adelaide metropolitan area, your house may be eligible for the 18 Week Build Time Guarantee!

To understand the build process a bit more please head to - http://www.statesman-homes.com.au/buying-guide/process/

If you have any further questions, please do not hesitate to contact us directly at [email protected]

Kind regards,
The Statesman Homes Team

Nat

Natasked

Can you please advise where the kitchen pendant lights came from in the Medindie display home in Aldinga.
Or the product code or name.
I had the same house built a few years ago.
Thanks

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi Nat,

The pendant lights in the Medindie display home were purchased from a lighting supplier who is no longer operating. We now source our lights from Beacon Lighting and I'm sure they'd be happy to assist in locating you something similar.

Thank you,
The Statesman Homes Team

J.Ferg

J.Fergasked

Hi, do Statman homes use Superlock?

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi J.Ferg,

Thank you for your question.

Statesman Homes does not use Superlock.

Regards,
The Statesman Homes Team

Nina Tenikoff

Nina Tenikoffasked

Hi
I was just wondering who I need to speak to about a problem with my stone bench top as the join has come apart. my house is nearly 12 months old and I'm sure this is not covered under the essastone warranty as it isn't a manufacturer fault but an installation one. Would love some help please. Thanks

2 answers
Statesman Homes
Customer Service T.Statesman Homes

Hi Nina,

Thank you for contacting Statesman Homes.

If you contact us directly at [email protected] we can pass your query along to our Maintenance Department.

Regards,
The Statesman Homes Team

Nina Tenikoff
Nina Tenikoff

I have sent an email.
Many thanks for a prompt reply
Nina

S and L

S and Lasked

Hi, wondering if anyone knows what is included when statesman homes have the move in upgrade promotions advertised?

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi S and L,

The Move In Upgrade promotion inclusions differ depending on which promotional period you sign your contract in. Please contact us at [email protected] for any further detail.

Kind regards,
Statesman Homes

Arthur

Arthurasked

Can we see an Oakland House display?

1 answer
Statesman Homes
Customer Service T.Statesman Homes

Hi Arthur,

Thank you for your question.

The Oakland design is unfortunately not on display currently. This home is best suited for north facing blocks & busy roads.

Kind regards,
Statesman Homes.

Mrs Warren

Mrs Warrenasked

We have had some problems with Statesman, and are about to build again, likely not signing up, but getting quotes. Our home is now 10 years young but these concerns detail that sub standard subbies built our home.
It took almost twelve months for slab because our stuff got stuck (lost, forgotten, misplaced) with engineering then the plan was wrong.
The issues are;
The Carport collapsed
Gable board flew off the front, and the next one is coming away too
Bench tops were not rolled under and The wood is expanding past the laminate
Kitchen Cupboard doors are peeling off (duroform) pot drawer has abig bubble in it, utensil drawer starting to peel
Bathroom and Ensuite tiling, the floor spacer pegs were grouted over, now the grout is coming away, stopped using ensuite ages ago, now can see the pegs in bathroom. We had the carport fixed, and one side of the gable, the rest has not been repaired but they know.
So what is the warranty on kitchen's? Does the tiling meet builders regulations?

2 answers
Statesman Homes
Customer Service T.Statesman Homes

Hi Mrs Warren,

We're sorry to hear your concerns. We've checked our maintenance records and we're unable to see any correspondence regarding the above.

Please contact us directly on 8366 0080, to discuss your above concerns.

Kind regards,
Statesman Homes

Mrs Warren
Mrs Warren

I will call again, but have done before.

Carport repair was amaze balls, and the one side of the gable Was fixed too

Would appreciate the tiling and grout being fixed in the shower alcoves, and kitchen being assessed, as perhaps a dodgy supplier. The gable on the other side requires securing.

jacqui

jacquiasked

Have to say I was and still am very disappointed with second rate quality took forever to build my daughters home then have the fit out so rushed that kitchen cabinet doors and towel rails started falling apart 3 days after she moved in and the huge pile of dirt that is still sitting in her front yard most of which isn't even from her lot she paid a fortune for a small landscaped garden that has been almost buried under a mound of dirt I would like to know that statesman/hickinbothem are going to resolve this for her without her having to pay out even more money?

3 answers
JohnMcFly
JohnMcFly

Can't answer that...I was a customer and found you had to hassle them (a lot). There's a lot we gave up caring about (the effort wasn't worth it)...we were disappointed but ultimately realise we chose them because they're cheap - and we learnt you get what you pay for....

Statesman Homes
Customer Service T.Statesman Homes

Dear Jacqui,

Thank you for taking the time to provide us with feedback on your daughters service. Whilst we understand that her experience has been less than satisfactory, we would like to take this opportunity to assist you & your daughter to ensure any outstanding issues are rectified as necessary.

In order for us to do this we will require your daughters details (name, lot number or job file number) in order to locate your file in our system. We would appreciate your understanding and cooperation in this matter in order to assist you with your query. Please contact us directly via [email protected] with your details and one of our experienced Client Services team members will be in touch with you.

Once again, thank you for taking the time to review our services. All feedback is shared with senior management as part of our ongoing commitment to excellent customer service.

Kind regards,
Statesman Homes

Can totally understand when we built with Statesman recently (taking house in November 2014) we paid a large amount in our contract with them to clear the lot, but that was a joke, when we got the keys we had to hire a private contractor to clear away weeds that were higher than the fence, metal poles that had been spaced out along 2 sides of property and they had weedmat attached to them (why??), the weed matting was under about 1/2 metre of dirt and rubble and the poles in the ground about a metre or so.
The contractor had to work hard and long to clear the site so we could start to landscape the yard and it cost us many $$$$ to get it done, we spoke to Statesman at handover about the state of the lot was were dismissed by the building supervisor. We are still arguing with Statesman about our brickwork and an error made by them (but of course it is not their fault). So over them I am now going to get very vocal about them.

chrystelle gower

chrystelle gowerasked

hi my name is chrystelle gower I moved into my house about two weeks before Christmas 2014 and I was just wondering when there going to start fixing things that are wrong with my house? I have already sent off the complaints form. around February. please get back to me as soon as possible.

thanks chrystelle

2 answers
JohnMcFly
JohnMcFly

Hassle, hassle, hassle. Ring them, email them and keep complaining. We got to a point where we gave up on some of the smaller (whicj is probably what they wanted). Some stuff on our final inspection list was never addressed....

Statesman Homes
Customer Service T.Statesman Homes

Hi Chrystelle. Thank you for your question. We passed your question along to our Maintenance team & we understand that they have been in contact with you this morning. If you have any further queries at all, please do not hesitate to contact us on 8366 0000. Kind regards, Statesman Homes.