134 questions from our users

Cheryl R

Cheryl Rasked

Clarendon Homes

Are private building inspectors permitted by Clarendon to inspect each stage of the build?



1 answer
Gayathre K.
Gayathre K.

Yes

Prabhdeep Singh

Prabhdeep Singhasked

Clarendon Homes

Hi,

I have heard that it's Clarendon Home's Policy not to modify the staircase in the double-storey homes. Can you please point me out where this policy is written because I have failed to find this in any Sales Brochures? I thought Clarendon Homes was different that Domaine Homes in this case and they build as per customer needs.

Thanks
Deep



1 answer
Clarendon Homes
Customer Care T.Clarendon Homes

Hi Deep. All building variations have to comply with internal guidelines. With regard to staircases, changes effect engineering of the home and frequently the stair case design, which is quite integral to the original floor plan. We therefore don’t allow changes to them.

Mark R

Mark Rasked

Clarendon Homes

how much does the madison 36 cost to build?

1 answer
Clarendon Homes
Customer Care T.Clarendon Homes

Hi Mark R. Please contact our sales centres on 13 63 93 for information on building prices in the area you want to build. It will also be helpful if you have details on the land you wish to build on.

Baybreeze

Baybreezeasked

Clarendon Homes

My fiance and I are building with Clarendon, Sheridan 37. Which we are extremely excited for but in the very early stages of the whole process. Just wondering What's everyone's build time been?



2 answers
Chris Bryan
Chris Bryan

Hi there, we built a Fairmont 38 with 2 storeys. Slab was layed early August and we were in the house in Mid May. We did have some issues with the roof as this was a new flat roof design so that probably added a month to the build. If you exclude the extra month, the build was 9 months. There was little rain so there were no real interruptions.

Hope this helps.

Cheers Chris

Joe98
Joe98

Our slab was poured late April 2018. We were promised "48 weeks after the slab was poured". It is very slow so I expect we get the keys in late April 2022.

MeganM

MeganMasked

Clarendon Homes

Hi Clarendon, we are waiting to hear back from Terry from the NSW design team about our issue regarding the window in our dining room. Our job can't be completed without this issue being addressed. Can someone please contact us. (Our ref number 29912472) Thanks Megan

No answers
Amore

Amoreasked

Clarendon Homes

I had posted a 5 star comment and it was not accepted. Why?
Regards
Amore

2 answers
Louise
Louise

Hi,
You need to attached either an email from Clarendon or a photo to prove that you did deal with Clarendon.
This information will not be posted due to privacy.
Thanks

Amore
Amore

I did upload a receipt copy showing I am a genuine customer having my house built by Clarendon. I also had posted and earlier review showing my credentials with added comments on my house progress.
So if I did do as you ask my new on-going comment should be shown.
Cheers
Amore

Kathryn H

Kathryn Hasked

Clarendon Homes

We are considering the Madison 39 with the "home within a home" option. Will there be and additional cost involved for this?

1 answer
Clarendon Homes
Customer Care T.Clarendon Homes

Hi Kathryn H. The 'Home within a Home' option includes an additional bathroom and kitchen area, which comes at an additional cost. You can speak to a Clarendon sales person who will have the options pre-priced on the list of homes it is available on. You can contact Clarendon sales on the 13 63 93 inquiry line to find out more.

Sylvia

Sylviaasked

Clarendon Homes

Hi Clarendon,my house was built sep last year. Now the lock is not working, dishwasher broken and the TV point not working either. Would you please advise how long the warranty will be for those items ?
(Job Number 29911364)
Thank you

1 answer
Clarendon Homes
Lyndal L.Clarendon Homes

Thanks for your enquiry and providing job details. Customercare will contact you promptly to assist with your enquiries.

Dharma

Dharmaasked

Clarendon Homes

I am finding difficult to choose the right builder for a double storey home. Can anyone please help me? Clarendon, Metricon and Mcdonald Jones in my shortlist, not sure which is the right one.

3 answers
John M
John M

Do your research, I've heard a few nasty stories from my clients regarding Metricon (gotten too big, too quickly, using cheap labour therefore quality of workmanship below par, I don't know about McDonald Jones.
My experience with Clarendon has been great.

Dharma
Dharma

Thanks John. Appreciate it mate.

Tee W
Tee W

Also be weary about McDonald Jones' pricing and sloping costs. We have a few friends who have been with McDonald Jones and they have slapped on costs for having to put in drop edge beams etc into blocks of land which are flat enough to not need them. All builders have their good and bad. Just remember at the end of the day, this is business for them (so they want to make the most money possible), and it is a 30yr commitment for you (so you want the best deal). Any discounts or offers they initially offer will sound absolutely fantastic, however there is more they can do if they really want your business. You just need to ask.

slmnma

slmnmaasked

Clarendon Homes

Wondering what the procedure is if unhappy with our site manager and customer consultants response to an issue?

3 answers
T Nguyen
T Nguyen

Have you tried to provide a review/comment on here and raised the concern? I am sure they monitor this website closely. Also if no success with management in Sydney, I heard someone else tried to contact the Queensland Head Office with the complains since Sydney is only a branch of Clarendon. All the best !!!

Clarendon Homes
Clarendon Homes OfficialClarendon Homes

Hi Simnma, Complete the feedback form on this page with as many details as possible about your concern. A relevant Clarendon team member will respond to you within 3 working days to help resolve the issue. As a further commitment, we’ll also follow up to see if your concern has been resolved to your satisfaction.

https://www.clarendon.com.au/nsw/clarendon-customer-feedback

Kind regards,
Clarendon Homes

joli29
joli29

Hi slmnma
I have the same problem. I submitted Customer Feedback Form last week, but have not received a response from Clarendon Management till now. Not sure if their complaint handling process works.

David

Davidasked

Clarendon Homes

Hi all,

I'm currently building with Clarendon and visited the site with the Site Manager. Wife and I noticed that the cornice at the exterior of the house is not continuous. There are gaps at corners and at the window frames. Site Manager says it's not a defect and it how the contractor chose to do it. We asked whether this can be fixed or not and he said no as it's cosmetic and not a defect. Appreciate any feedback from the forum before we go back to Clarendon. You can see what I mean in my profile picture as I can't upload images when asking a question.

Thank you.

Cheers,
David

1 answer
A Armitage
A Armitage

This should be fixed, thats not fair. I would check your contract plans and display homes and them as justification to be resolved before handover. Maybe start an Instagram account tracking the build of your home too. Good luck

Ron

Ronasked

Clarendon Homes

What is better - tile roof or colour bond?

3 answers
Uplifting
Uplifting

Colour bond is lighter than tiles (at 5-10kg per square metre vs 40kg) and sealed better on the roof. However concrete or ceramic tiles allow any vapour or condensation to dry through concrete/ceramic tile. A colour bond roof requires a layer of insulation above the sarking to minimise condensation and then a ventilation system to help any evaporated water to escape out in to the outside air. I like tiles for that reason. Note ceramic tiles don't loose their colour but cost more that concrete. Get some quotes and if the difference is not too much go ceramic. Your choice offcourse.

Ron
Ron

Thank you!!

Tee W
Tee W

I would choose Colourbond over Concrete tiles. However I would choose Terracotta tiles over them both. Clarendon have a special offer on the terracotta tiles at the moment- a very good offer!

Ron

Ronasked

Clarendon Homes

In the tender it says extra cost due to double handling due to site conditions - what does this mean?

1 answer
Ordinarycustomer
Ordinarycustomer

Hi Ron
I hope you have not signed the tender contract yet. Please check and ask all the questions you have with them and ensure all your doubts are cleared. There are extra hidden costs you need to be aware for each site, depending on the site condition - eg flat land or with slope; rocks etc.
It’s better to know and expect what extra costs you could be charged than a big “surprise” later.
One more advice, make sure you check the “liquidated damage” on the tender the amount per day is reasonable to you. That is the amount they will compensate if the don’t complete the job on time! Make sure before you sign the tender contract you get some legal advice or have someone with building or legal knowledge to go with you.
Good luck!

Meheksyed

Meheksyedasked

Clarendon Homes

Hi my house was built by Clarendon homes back in 2008/2009, I have purchased this house from the first home owner in 2015, since last 8 months I have noticed deep cracks in my ceiling to different areas of the house mainly all to the right side of the house and this is spreading to hall way, kitchen, living and master bedroom. I have engineer's report that states this is due to faulty installation of cooling unit that and also Roof trusses not up to correct standards. I need to contact you ASAP to discuss this matter. I have also sent an email to '[email protected]'. Please advise how I can get in touch to discuss this matter as you no longer have offices in Melbourne.

1 answer
Clarendon Homes
Customer Care T.Clarendon Homes

Hi Meheksyed. You have emailed the correct address. You may also call our Sydney office for assistance on (02) 8851 5300

RAVI

RAVIasked

Clarendon Homes

Hello everyone I am planning to build sheridian 39 with claredon homes at box hill i just wanted to know has anybody had any good or bad views about the builder the quality of work,framework internal or external any hidden cost or anything as this is my first time building the house? any views much appreciated thanks ravi

1 answer
Grewal
Grewal

We are building with Clarendon at same place at BOX HILL. Our house is already late for 3 months .Finishing quality is very poor.Even we hired a independent inspector. Clarendon not like to listen him and rectify our problem. From last month they giving 2 weeks for handover.but they still did not provide final data.site manager not like to reply same as their customer service. We sent so many emails but no right answer. Our building inspector told in report thatbricks have poor finish.insulation is not done properly.bad cut tiles.missing grout.we are not happy with their quality as charge hefty amount. Even we asked customer service to give us number of any responsible person in Clearndon but no reply.you can make sure with them before proceed.

PLM

PLMasked

Clarendon Homes

Hi.

My mother wants to build a big single story house (around 400-500 sqm) which has a parent retreat with kitchenette.

Would you do a custom design/building?

Cheers,
Boram.

1 answer
Clarendon Homes
Customer Care T.Clarendon Homes

Hi Boram. Clarendon has more than 50 home designs to choose from and can offer the flexibility of altering a plan to suit your mothers personal needs. By the looks of your initial brief, the Maitland 40 is probably the best design to start with, although there are others to choose from. If you call us on 13 63 93, a sales consultant would be more than happy to assist you with your inquiry in more detail.

Mathew P

Mathew Pasked

Clarendon Homes

Can anyone tell me the outline of progress payments for building please, after the original $1000 deposit what’s next and so on TIA

1 answer
A Armitage
A Armitage

I believe it’s $1k for tender, $2k and then 5% to execute contract. Usually bank will pay remaining after contract is executed (this is how it worked for us).

Duong

Duongasked

Clarendon Homes

Hi,

May i ask what is the name for the white that used for the garage and the window frame? And what is the model of the caesarstone for the kitchen bench top. I loves that white look with the black strip you got on displayed in Boston 36. Beautiful house throughout.

Cheers,
Duong

1 answer
helpful dude
helpful dude

it is called burgundy

Duong

Duongasked

Clarendon Homes

Hi,

Does anyone know what exterior colors of grey shade for the Boston 36 home display with Clarendon? Im rendering our house and loves the color they have. I tried to ask them at the displayed home but hey couldn't tell me.

Thanks

4 answers
Clarendon Homes
Tim R.Clarendon Homes

Hi Duong,

The colour used at the Boston 36 at our Parklea Display is - Bristol Canyon Cloud.

Duong
Duong

Thanks Clarendon home.

May i ask what is the name for the white that used for the garage and the window frame? And what is the model of the caesarstone for the kitchen bench top. I loves that white look with the black strip you got on displayed in Boston 36. Beautiful house throughout.

Cheers,
Duong

Duong
Duong

Hello Clarendon home,

Are you able to share the info, please?

Thanks,
Duong

Mel

Melasked

Clarendon Homes

Has anyone had trouble getting their interim occupancy certificate? We did handover last week and the interim occupancy certificate isn’t in the handover folder and our bank needs it to proceed with valuation and payment. We have given notice at our rental property and now we realise Clarendon hasn’t given us all the documentation we need. Help!

1 answer
Kimmo
Kimmo

Sorry Mel but we have built a few times and haven't heard of that before!

You really need to hound them regarding this matter.. Remember the squeaky wheel gets the most attention!

Page 2 of 7