184 questions from our users

Angry customer

Angry customerasked

Burbank

Hi Burbank,
Our contract says you will make our house ready within 364 days after slab ie, 13.5 months. That day is passed on 4/9/18. So Supervisor told a new date 3/10/18. Ie day after tomorrow. Garage painted not done, rendering not completed, tiles are still sitting in garage. How will you hand over on day after tomorrow? How many more days we need to wait? How long you need to build a double storey home?? I hope your future customers will get an idea before they are trapped by your lovely sales managers.

2 answers
Burbank
Burbank H.Burbank

Good morning,

In order to assist you I would require your job number or address. Please email me at [email protected] with this info so I can assist you here.

-Sam



According to Australian domestic building contract ACT, the builder must pay the owner for any loss time or damage. The builder must give in writing the reason why the builder cannot finish by contract date and must give this to the owner, the owner then can reply . The owner can submit within 15 days to the builder of he/she concerns and why the owner will be claiming for loss because contract date was not completed on time this must be put in writing to builder. So to answer to everyone's questions is the builder cannot go over contract finish date without a good reason.
And to all consumers do not pay your final payment unless all defects are fixed. It's your right don't let builder tell you otherwise.

Soke

Sokeasked

Burbank

Please let me know who we can contact for changing our plan. We did contact [names removed] who dealt the contract with us but they both left Burbank. Then tried to call [name rmeoved] & your office & leave the messages, call, email & leave messages to [name removed] since couples weeks ago but nobody answered at all. We are so disappointed at very first stage.
Our job work number 15525 - [details removed]

1 answer
Burbank
Burbank H.Burbank

Hi Soke,

I apologise for the delayed response. If you would still like our assistance please email [email protected]
-Sam



Isaac

Isaacasked

Burbank

Hi Burbank,
How long does it takes for you to fix a water hot tank system that your tradies broke ???

1 answer
Burbank
Burbank H.Burbank

Hi Isaac, I can see you have emailed me also so I will Liaise with you via email.
-Sam

don

donasked

Burbank

What is the usual build time in the north for a single story house? is there an end date or

4 answers
Burbank
Burbank H.Burbank

Hi Don, This would depend on numerous factors and doesn't have a straight answer im sorry.

One of our consultants may be able to give you a rough estimate after chatting with you around what you're after.
Id suggest emailing us at [email protected] and we can have a consultant get in contact with you.

Thanks
Sam

Ripu
Ripu

with Burbank ?????

don
don

yeh with burbank?

parveen

parveenasked

Burbank

can anyone help me in understanding what can I do if my handover date is delayed by more than 250 days with Burbank Homes?

1 answer
Burbank
Burbank H.Burbank

Hi Parveen!

Please email us at [email protected] with your job details and I can look into this for you.

-Sam

M Rad

M Radasked

Burbank

I build my new house with Burbank and my hot water system is not working properly. I have to turn on the tape for atleast 2-3 minutes to get the hot water out. Can you please advise where do I contact? It is really a big issue for me now.

Looking forward to hearing from you.

Thanks

1 answer
Burbank
Burbank H.Burbank

Hi M Rad,
You will need to contact our Burbank Warranty department.
Please email them at [email protected] with your address and concerns.
Thanks- Sam

Ying Wang

Ying Wangasked

Burbank

I have been to Upper Point Cook estate in Victoria in Nov 2017 and Burbank display's consultant hold a piece of land from the developer. That day I paid $1000 to the land developer directly to hold the land. AND I HAVE BEEN ASKED TO PAY $5,000 INITIAL DEPOSIT TO BURBANK to build the house. Later I found the floor plan has few disadvantages that I don't want to build it. The new home registration was signed. The $5000 receipt has been given. But The color hasn't been chosen and contract hasn't been parpared yet. The land is not titled yet as well. So till now Burbank hasn't done too much yet. I am wondering how can I get the deposit refunded? If the clause that: [This deposit remains refundable up till I/WE - The owner(s) sign the new home registration] works. The amount should only be $1500 while not $5000. How can I give back the money that should be refunded?

1 answer
Burbank
Burbank H.Burbank

Hi Ying, Please email me at [email protected] with your Lead number ( Starts with L followed by 6 digits).
I will look into this for you once I receive your email.
Thanks
Sam

Jesika

Jesikaasked

Burbank

We have put a $1500 deposit down on a house through Burbank, site costs have come back higher then we can afford, due to block having a fall. The amount is now more then the bank will lend us. Can we cancel and get our deposit back?! Thanks

1 answer
Burbank
Burbank H.Burbank

Hi Jesika,

Thankyou for your message!
Your query does depend on a few things like what works have already been put into the job (soil tests, drawings etc.)
If you would like to email me at [email protected] with your Lead number, name and best contact number I can give you an answer more crafted to your build.

Thanks
Sam

Builder 2018

Builder 2018asked

Burbank

How much extra does it cost for N3 wind rating from N2 wind rating?

2 answers
Burbank
Burbank H.Burbank

Hi there,

Cost would be $6 per m2 of house.
This would cover extra bracing as specified by the engineers (including but not limited to steel bracing and plywood bracing).

Hope this helps.

Thanks
Sam

Builder 2018
Builder 2018

Hi Sam thanks for your assistance with my enquiry. I am looking to built with Burbank and the house we are interested in is approx 290m2 so would you say N3 additional cost for this size house should be approximately 290 X $6 = roughly $2,000. Can you also give me an estimate of how much an M slab is extra over an S slab for this size house.

Willy w

Willy wasked

Burbank

Hi guys hinking of doing a build with Burbank and is there a chance to view the Clifton 130?plans is one thing but visually seen will make the difference
Thnks

1 answer
Burbank
Burbank H.Burbank

Hi Boyce,
Thankyou for your question.
As you are aware we do not have this particular design on display.
However if you would like to email us at [email protected] we can have a consultant give you a call to discuss your options!

Thanks
Sam

Dom Rego

Dom Regoasked

Burbank

Please contact Dominic Rego [contact detail removed]
New build at 34 Victoria St Malabar NSW
2 storey 4 bedroom rear lane double garage and granny flat.
Scope: Knock down existing fibro house and new build
DA approved plans by architect
Looking for a reliable competitive builder
Modern design with lightweight building materials
Aim to start building end of 2018
Please let me know if this fits your scope ?
[email address removed]

1 answer
Burbank
Burbank H.Burbank

Hi Dominic,

Thankyou for your message.
Due to privacy your contact details and email address have been removed by product review.
Could you please send an email to [email protected] including these details and I will be happy to assist you.

Thanks :)
-Sam

Burbank_Bad_Choice

Burbank_Bad_Choiceasked

Burbank

How long it takes to reply for a phone call from New Home Coordinator?
It is a week now and I've not got any reply.
How much does it cast to get a good qualified good admin staff?
It is all about good communication and follow up.
I'm sure it is not there problem it is your because you don't have enough staff.

1 answer
Burbank
Burbank H.Burbank

Hi there,

Thanks for taking the time to reach out- do you mind providing me your job number or the name of your New Home Coordinator so I can follow this up for you?

Customer service is one of our top priorities as a business, and we will definitely take this on board.

Kind regards,
Sam

Nicole

Nicoleasked

Burbank

Hi there just wondering after land titles and it's settled how long after this can burbank start our build. I was told 6-8 weeks before they could start? Is this correct?

Thanks

1 answer
Burbank
Burbank H.Burbank

Hi Nicole,

Thank you for your enquiry.
To answer your question, We generally say 8 weeks.
After the land titles we need to order the PIC (Plumbing Inspection Certificate) from the council which provides up all the details regarding the sewer, storm water and water and the connection points for these items (the depth of the pipes, exact location etc.). This usually takes 4-5 weeks from the time the title is released to be provided to the council and uploaded so we have access to It, from there we confirm our slab design and arrange the building permit. Without this we are unable to get our building permit.
Having said all this, Burbank’s workflow is also a factor we need to consider.

If you are currently building with Burbank and wanted some further clarification or an answer more catered to your build please email us [email protected].
We hope this has helped.

Regards,
The Burbank Team

Inge

Ingeasked

Burbank

Planning to build in Sunshine Coast, Queensland in a block not connected to a council sewerage system. I would appreciate a point to point answer to the following questions.
1. If I build with Burbank, will I be allowed to supply my own HSTP through an independent installer or will Burbank require me to install the HSTP with Burbank?
2. If I will be required to install the HSTP with Burbank, will Burbank install it by itself or contract an installer? Of course the tank and components may come from suppliers like Taylex.
3. Can you tell me about Burbank's length of experience in installing HSTPs in Queensland?
4. Do you have a knowledgeable staff that can be consulted about suitable designs and costs of HSTPs in Queensland?
Hope to hear from Burbank
Thank you

3 answers
Burbank
Burbank H.Burbank

Many thanks for your enquiry Inge.

As a related matter we currently build as far north as Noosaville, as far inland as Cooroy in a vertical line all the way down to Beerburrum. If you are looking to proceed and your land is located in these locations please provide your lot address so we can be sure your site is within our build boundary.

To answer your questions on HSTP systems:-

• We have over 6 years’ experience in QLD installing such systems.
• Independent installers/suppliers are contracted through Burbank to provide and complete the system installation.
• Yes Burbank must provide and install the system as this must form part of the building approval application, further; the system will be covered by our builders insurance and fall under our maintenance obligations, similar to any other appliance or system provided under our building agreement. The full details of the system likely to be used (or example) is a Taylex Tall 400 Concrete ABS System, the price includes a Nitto Medo LA80B Blower and a Davey D25 pump.
o Full details of this system can be located by clicking the following link - http://www.taylex.com.au/Images/13159%20Taylex%20Product%20Catalogue%202014-2015%20Web.pdf

We hope this information is useful. Please feel free contact us with any further questions.

We thank you for the opportunity to assist.

Regards,
The Burbank Team

Inge
Inge

Thanks Burbank Team
And your answer to question 4?. Who is your knowledgeable person to talk to about your HSTP?

Burbank
Burbank H.Burbank

Hi Inge,

We would like to provide you with contact details to further discuss.
If you could please send us an email we will pass on details of the correct personnel.
or alternatively please provide your details to that email address and best time of day to contact you.
[email protected]

Regards,
The Burbank Team

Yakka

Yakkaasked

Burbank

Is it normal for the concrete to crack in the garage even though the build is still not finished.
Can't see the rest of the slab due to floor coverings in place.

2 answers
Burbank
Burbank H.Burbank

Hi Yakka,

In order to assist you further could you please email us at [email protected] with your job number and address.

Regards,
Burbank

Unhappy customer
Unhappy customer

Make sure your garage has control cuts put in after concrete was completed without control cuts the slab will crack all over ugly, make sure the cracks are no wider then 2 mm if this is more then 2mm you have slab movement. But also depending on how well the job was done if boxing up was done correctly a concrete slab takes 28 days to full cure. And also no rain before or during concrete thus is so important and hopefully it did not rain to soon after the poured concrete. All these things will create problems for your slab don't let builders tell you that its normal and within Australian Standards which is not. Do not be conned.
Regards.

Klun

Klunasked

Burbank

Hi guys,

I wish to ask if you have experience of waiting for more than 2 years, i bought home and land package from burbank, and i had waiting for almost a year and half year for land to tittle, and i had deposit 5% with burbank and appointment edge studio everything done since September 2017, also i cant change anything since, February this year land already tittle and i have to wait and wait for the ADMINISTRATION, i am not sure long how for them to start to build? appreciate with your answer, its helping me a lot.

regards
khanha

6 answers
Wen
Wen

we went to select the edge studio in December, and have to wait until April to get started to build, and suppose to finish by the following year in April, and we have to wait until July to settle, and our supervisor resigned before the settlement, Burbank didn’t let us know

Burbank
Burbank H.Burbank

Hi Khanha,

In order for us to answer this question for you we would need further details. Each home is a different build therefore requires different timeframes.
If you would like us to look into this further please email [email protected] with your job number and address.

Regards,
The Burbank Team

Yakka
Yakka

Hope your ready for a lot of reselecting of items you have chosen due to discontinued items from suppliers.

Supervisor resigned seems to be a lot of stuff turnover at Burbank.
our supervisor resigned so did the project manager and our customer relations officer.
P.S your completion date doesn't start until slab is down so expect more delays till then.

Say Rah

Say Rahasked

Burbank

You have to pay $1500 to get a fixed price tender from Burbank but there is no security that the fixed price will be even close to what has been provided in the estimate. We even asked for confirmation that it will be within 5% as we are worried about site costs on a sloping block. You’d think the experts will have a sense of these things of course keeping some buffer for soil test and surveys but Burbank won’t stand behind their estimate or offer a refund of the $1500 if they are more than 5% or even 10% off. I get the feeling the estimate is a low ball figure to get you committed. Can you confirm whether you stand behind the estimate and whether you provide a refund if the estimate has blown out more than say 10%?

2 answers
Burbank
Burbank H.Burbank

Hi Say Rah,

Thanks for your question regarding pricing.
As you can imagine, sloping blocks can be tricky and as much as we would like to provide an initial estimate as close as possible, it’s often very difficult without all the information, hence we require a deposit to engage our experts in many hours of work to determine the most suitable slab design for your site and therefore the associated costs. We take this task very seriously and want to ensure all items are captured at this stage so no surprises down the track. Once we have fixed these costs all liability falls upon Burbank and we stand by this. Until we have fully investigated the site, any estimate is simply that, and estimate. We hope this helps and are happy to discuss further so as to explain the costs associated with your home.

Thanks,
The Burbank team

If you have a slopping block beware with out drainage you will have slab heave, you must have soil report done first the builder has to give you a copy of the soil data. It's the worst excuse I've heard Burbank has been Doing this long enough to know what happens with a sloping block depending on the slope and if you have trees or if there was any houses on that land before subdivision this will impact the land. Unless the soil test is correctly tested and if you have abnormal soil or normal and if they use the Ys estamate or the Appendix D unless you laboratory testing the soil test will not be accurate.
Please contact me if you need to know more I am sick and tired of Burbank crap so I am fighting back .

Deval

Devalasked

Burbank

Hi There,

I had recently builded home with Burbank . I would like to know is driveway build by Burbank is considered under structural warranty or not ?

Your earliest response will be appreciated.

Thanks

2 answers
Burbank
Burbank H.Burbank

Hi Deval,

Thanks for getting in touch!

We have spoken with the warranty team who have advised that a concrete driveway is not a structural item and does not come under a structural warranty.

If you’d like to talk to someone, leave your details and the warranty team would be more than happy to get in touch.

Kind regards,

The Burbank Team

Unfortunately driveway is not under structural warranty unless the concrete is really bad that has cracked all over. Then Burbank would have to call the concreter back to fix the issue.
Hope that helps.

Burbank_Bad_Choice

Burbank_Bad_Choiceasked

Burbank

The administration does bot take 12 weeks. They told me it takes 14- 16 weeks. It has been 24 weeks and they have not started building yet. Since early October they have been asking me to clean the land and cut the grass but nothing is happening. They don't respect the time frame once you pay deposit. I had to chase the sale consultant for few weeks to get the final draft done. He kept saying that all engineering department have gastro so no one can do it. The easiest way is to ignore the phone calls and emails. Can you tell me when the construction will start no?

3 answers
Burbank
Burbank H.Burbank

Hello,

In order to assist you further I will require some details.
Can you please email your job number, address and best contact number to [email protected] so we can look into your concerns.

Regards,
Burbank

Klun
Klun

Hi Burbank bad-choice

Nice nick name anyway, i am in that situation as well, can you tell now your house start to build after all this hard time ? thanks

Hi Klun,
Sorry for delay reply. Yes my house started and everything is not bad. I don't know much about technical issues but the supervisor so far has a good communication. Still if I need any help through administration I don't get any help, they are useless. If I'm building again I won't choose Burbank. Have a good luck with your supervisor that is your only hope.

Hitesh Rana

Hitesh Ranaasked

Burbank

Hi Burbank Team

I have got titled land in officer since one and half year and have got 4 quotations from 4 different builders . Now I’m thinking to build my home through builder even though I have heard bad stories from people about Burbank and have read all the remarks here ... even though I’m still thinking to build my home from you... before making that step can I speak to someone in higher position and get something in written that I won’t be wasting my time building my home with you ??? And there won’t be any hassles ?? And all the transition has to go through smoothly ??

Regards
Hitesh Rana

5 answers
Burbank
Burbank H.Burbank

Hi Hitesh Rana,

Lovely to hear from you.

This is a question we frequently receive from prospective customers- how long will it really be until you get the keys to your new house?

Well the short answer is, every house varies. Depending on the complication of your build, whether it is a single or a double storey design, if it is on sloped land and so on can all impact the time of the build. Additional factors include extreme weather conditions, delays in the required approvals from council and town planning and so on. It’s important to keep in mind that the reasons for delays are by no means restricted to Burbank- all builders are faced by the same challenges.

We usually say that a standard single storey home should take 4-6 months in construction.

At Burbank, we offer our customers Guaranteed Site Starts, which are available for those whose land is ready and when the developer has completed all roads and services to their land.

A Guaranteed Site Start date also assumes the customer available for appointments as requested to ensure we remain inside the scheduling dates and also assumes that a customer is able to make decisions quickly (within reason) and sign off on documentation ensuring the ball continues to roll throughout each stage of the build.

You’ll discuss these intricacies with your New Home Consultant who is an expert on all things house and land, and once you have finalised all of your sales paperwork and completed the sales process (i.e selected the design you like and all changes) a Guaranteed Site Start day can be offered.

The administration period takes approximately 12 weeks from when you complete the sale process, so you can be on site within 12 weeks of completing your sales process.

The time frames of construction in itself as previously mentioned vary from home to home, however as a rough guideline we say the process will generally take anywhere from 4-12 months. The exact forecast will be highlighted in your contract which will also provide a completion date set at the beginning of the build. Further, the contract will detail how much Burbank will reimburse you should the build exceed this timeframe.

This will of course allow you to arrange all that you need to in terms or organising the timing of varying factors.

Another benefit of building with Burbank is our new platform ‘MyPlace’, which allows you to track the progress of your land through an online platform with graphs and imagery of your site so that you can see you home as it moves from stage to stage.

Hopefully this sheds some light on your queries- we understand how enormous the decision is when it comes to choosing a builder and hope this clarification has provided you confidence in choosing Burbank- we’ve been building homes in Australia since 1983 and we would certainly love to build yours.

Thanks for your email Hitesh and if there is anything else, please do get in touch.

The Burbank Team

Hitesh Rana
Hitesh Rana

Thanks for the info . Can I have any contact number pls with basic questions .

Regards

Hi Hitesh Rana,
That is not right . The administration does bot take 12 weeks. They told me it takes 14- 16 weeks. It has been 24 weeks and they have not started building yet. Since early October they have been asking me to clean the land and cut the grass but nothing is happening. They don't respect the time frame once you pay deposit. I had to chase the sale consultant for few weeks to get the final draft done. He kept saying that all engineering department have gastro so no one can do it.